MT-HVC-08 · HVAC Control

Run the plant for the bill.
Not the design day.

LIVE·0.66 kW/TR · COP 5.4 · 320 free-cool hrs YTD

Adaptive CHW + CDW reset, free-cooling hand-off, pump and tower sequencing, AHU + VAV supervisory control. Closes the loop on the entire plant, all the way down to the FCU thermostat — and runs the equipment you already own at 15–25% lower kW/TR.

What we control
Chiller plant · 4–8 unitsAHU + VAV + FCUCooling tower VFDPump sequencingWaterside free-coolAirside enthalpyCHW BTU billingBACnet/IP · Modbus
MT-HVC-08 · Chiller plant optimiser — live
Sensoverse/Energy/Five-star hotel · Plant 1 · 4×450 TRLIVE · 14:32 IST
CHILLER PLANT · LIVEWET-BULB 19.4 °C · OAT 26.8 °C
COOLING TOWER · 2 CELLSAPPROACH 4.1 °CCHILLERS · 4 × 450 TRCH-1LEADLOAD92%kW/TR0.61CH-2LOAD78%kW/TR0.64CH-3LOAD54%kW/TR0.74CH-4LOAD0%STANDBYSEC PUMP · 58 HzAHU + FCU LOADAHU-NW76%AHU-NE84%AHU-SE71%AHU-SW68%FCU x8854%FREE-COOL ETA24 minCHW supplyCDW supplyCDW return
Plant kW/TR · live
0.660
Plant COP · live
5.40
Free-cool hrs · YTD
320hr
ton-hr · today
1834
// 4×450 TR plant. Adaptive reset · waterside free-cool armed at 24 min. CH-3 flagged for unload + rotation.
18%
Cooling kWh saved
5.8
Best plant COP
11 mo
Typical payback
320 hr
Free-cool / yr
§01 — What this is

Most chiller plants are sized for the design day and run there forever. Ours runs for today's weather.

01

Adaptive · not fixed

CHW supply, CDW supply, tower-fan speed, pump-VFD setpoints — all reset against today's wet-bulb and today's load. Finds the daily plant minimum kW/TR; doesn't sit at the design-day number forever.

02

Whole-plant supervisory

Chillers, pumps, tower, AHUs, VAVs and FCUs sequenced as one system. Lead/lag/standby on runtime balance, trim-and-respond on the AHU header, demand-control on every zone.

03

Free-cooling — armed

Waterside hand-off when CDW return < CHW return + Δ. Airside enthalpy on every AHU. Most buildings have 200–400 free-cooling hours a year hiding from their BMS. Ours catches them.

§01 — Complete stack

End-to-end. Not just a device.

A solution is hardware in the field plus the infrastructure that makes the data useful — secure ingestion, a dashboard your team actually opens, and APIs to whatever runs your business.

L4
Apps & Dashboard
Role
Visualisation, role-based views, reports, alerts, ticketing
Tech
Sensoverse Web · Mobile · Open API · Webhooks
L3
Application Server
Role
Business logic, rules engine, analytics, ML, multi-tenant data isolation
Tech
Sensoverse Cloud · on-prem · hybrid · TimescaleDB · Postgres · ClickHouse
L2
IoT / Network Server
Role
Device management, message routing, decoding, OTA, downlinks
Tech
ChirpStack · MQTT broker · LwM2M · OPC-UA gateway
L1
Field — HVAC Control (MT-HVC-08)
Role
Sensors, actuators, edge compute, gateways
Tech
BACnet/IP · Modbus · BACnet MS/TP

// Deployments can run on Sensoverse Cloud, on your VPC, fully on-prem, or hybrid. Data residency: India (Mumbai) and UAE (Dubai) regions available.

§03 — What it controls

Eight control loops. One stack.

Pick a row — see how the loop closes.

01 / 08 · Chiller plant optimisation

Adaptive CHW + CDW reset

Closes the loop on CHW supply, CDW supply, approach temperature and tower fan speed. Adaptive reset finds the plant minimum kW/TR for the day's wet-bulb — 15–25% saving on legacy plants without changing equipment.

Adaptive CHW reset
CDW + approach reset
kW/TR ranking · 4 chillers
Plant COP report
§04 — Why not just a BMS

A BMS reports the plant. Ours runs it.

Most BMSs sit on top of the chillers' factory controllers, scrape values into a database and trend them on a screen. They schedule, they alarm, and that's about it. The cost reduction comes from closing the loops the factory controller can't see — across chillers, towers, pumps and air-side at the same time.

The old way

BMS · scheduler + alarm

Loop closureFactory chiller only
CHW resetFixed setpoint
CDW resetFixed setpoint
Free-coolingManual hand-off
AHU controlTime-of-day only
ImprovementVisibility, not action
MuTech · supervisory

Whole-plant control

Loop closurePlant + air-side + tower
CHW resetAdaptive · daily
CDW resetWet-bulb-tracked
Free-coolingAuto hand-off · armed
AHU controlDCV + enthalpy + trim
Improvement15–25% plant kW/TR
§03 — Dashboard & analytics

What your team sees.

Live KPIs, drill-downs, scheduled reports, and role-based access — out of the box. Custom widgets and white-label themes available.

Cooling kWh today
1,820
vs 2,140 baseline
Chiller COP
5.8
Plant-level
Chilled water ΔT
5.6 °C
Setpoint 6 °C
Free-cooling hrs
4.2
MTD
Insights produced
  • 01Plant performance — kW/TR per chiller, with ranking
  • 02VFD ramp histories vs demand curve
  • 03Free-cooling availability vs actual utilisation
  • 04Energy savings reports for ESG / GRIHA / LEED
Alerts & events
  • COP drop > 10%
  • Approach > 2 °C
  • VFD fault
  • Sensor fail
// Channels: SMS · Email · WhatsApp · webhook · ITSM
§04 — Security & infrastructure

Built for plant & campus IT.

Industrial sites have non-negotiables — segmentation, audit trails, and the ability to run when the WAN drops. We design for that on day one.

Transport
TLS 1.3 device → cloud. Mutual auth via X.509 or pre-shared keys. LoRaWAN 1.0.4 / NB-IoT carrier-grade encryption end-to-end.
Identity
Per-device certificates, automated rotation. RBAC + SSO (SAML / OIDC). Audit log of every operator action.
Data
AES-256 at rest. Tenant isolation at row + schema level. Configurable retention, GDPR / DPDP-aware exports and deletes.
OTA &amp; ops
Signed firmware, staged rollouts, rollback. 24×7 monitoring, on-call, runbooks. SLA up to 99.95%.
Deploy
Sensoverse Cloud (default), private VPC, on-prem (air-gapped), or hybrid. Mumbai & Dubai regions.
Compliance
ISO 27001 controls, SOC 2 Type II in progress. Vendor / penetration test reports under NDA.
§05 — Use cases

How customers use it.

Real applications, real outcomes. Every site is engineered — these are reference deployments to anchor a conversation.

HospitalityUSE-01
Scenario
Hotel chiller plant — adaptive CHW reset + VFD optimisation
Outcome
18% cooling kWh reduction; payback 11 months
CommercialUSE-02
Scenario
Office tower — AHU sequencing + free-cooling hours
Outcome
320 free-cooling hours/yr unlocked, peak demand -8%
EducationUSE-03
Scenario
Campus — chiller plant of 4×450 TR with thermal storage
Outcome
Plant COP improved 4.9 → 5.8 over 6 months
§07 — Devices used

The full HVAC-control stack.

Plant controller, VFD interfaces, AHU / FCU / VAV controllers, sensor packs, tower + pump controllers, and the Sensoverse Energy platform. Sized to your plant after a one-call scoping.

Model
Role
Key specs / note
MT-HVAC-CTL-32
HVAC plant controller
32 PID loops · 256 BACnet/IP points100 ms control cycleBACnet/IP + Modbus TCP/RTU

Drop-in supervisory controller for chiller plant + AHU. Local control survives BMS outage.

MT-VFD-IO
VFD interface module
Delta · Danfoss · ABB · YaskawaClosed-loop ramp + ride-throughModbus RTU + EtherNet/IP

Talks native to the drive — no analog tap, no parameter guessing. Read DC bus, motor temp, fault history.

MT-AHU-IO
AHU / FCU / VAV controller
8 AI · 4 AO · 8 DI · 4 DOModbus RTU + BACnet MS/TPPer-loop 100 ms cycle

Closed-loop survives BMS outage. Works with Delta, Daikin, Trane, Carrier packaged controllers.

MT-CHW-SENS
CHW T + P sensor pack
RTD pair · ±0.1 °C matched0–16 bar pressure · ±0.25%Stainless thermowell

Class-A RTD pair, factory-matched, for BTU computation. Drop-in 1/2" NPT thermowell.

MT-FLOW-US
Ultrasonic CHW flow
Clamp-on or in-line · DN50–DN300±1.0% reading · NABL-traceableRS-485 · 4–20 mA

Clamp-on retrofit for chiller plant audit — no pipe cutting, no shutdown. In-line for new installs.

MT-TWR-CTL
Cooling tower controller
Fan VFD + bleed valve + makeupSump conductivity + levelBACnet MS/TP + Modbus

Cycles-of-concentration logic, fan VFD on approach. Sump conductivity drives bleed-and-feed.

MT-PUMP-CTL
Pump sequencing controller
Up to 4 pumps · LLS rotationΔP + return-temp inputsModbus to all major VFDs

Lead / lag / standby on runtime balance. Primary-secondary or variable-primary topologies.

Sensoverse — Energy
Plant performance analytics
kW/TR ranking · plant COPFree-cooling-hours reportkWh / ton-hr tenant billing

Operator console for plant + facilities team. Daily plant-performance email lands at 06:00.

§08 — Specifications

Engineering data.

// Indicative — full datasheet on request.

Controller32 PID loops · 256 BACnet/IP points · 100 ms cycle
Control loopsCHW reset · CDW reset · approach reset · DCV
SequencingChiller · pump · tower · economiser hand-off
Sensor inputs4–20 mA · 0–10 V · RTD · thermistor · digital
CommsBACnet/IP · BACnet MS/TP · Modbus TCP/RTU · OPC-UA
VFD supportDelta · Danfoss · ABB · Yaskawa · Schneider · Siemens
BTU meteringUltrasonic CHW flow + Class-A RTD pair
Power24 V DC controllers · PoE sensors · UPS-backed
EnclosureIP54 controllers · IP65 outdoor (tower)
Operating temp0 °C → +50 °C indoor · −20 °C → +60 °C outdoor
Plant capacityUp to 8 chillers · 16 AHUs · 250 FCUs per controller
Free-cooling logicWaterside hand-off + airside enthalpy
IntegrationExisting BMS via BACnet · MQTT / REST egress
CertificationsBTL listed · BACnet B-AAC · CE · BIS
§09 — Deployments

Where it's running, right now.

HospitalityChiller plant
since 2024

Five-star hotel · Mumbai

Hospitality · 4×450 TR chiller plant
12
points online

Adaptive CHW + CDW reset cut plant kW/TR from 0.81 → 0.66 over six months. 18% cooling kWh reduction; payback in 11 months on a 5-yr-old plant.

CommercialAHU + VAV
since 2025

Commercial tower · Dubai

Commercial · 24-floor office, AHU + VAV
186
points online

AHU sequencing + free-cooling logic unlocked 320 free-cooling hours/yr. Peak demand cut 8%; tenant CHW sub-billing automated for the first time.

EducationThermal storage
since 2023

University campus · UAE

Campus · 4×450 TR with thermal storage
28
points online

Plant COP improved 4.9 → 5.8 over six months by adaptive condenser-water reset alone. Thermal storage sequencing aligned with peak-tariff windows.

§10 — Pilot

A 30-day plant audit. For a fixed fee.

Drop our gateway on the plant LAN for 30 days. We come back with a measured kW/TR baseline, a sized BOM, an opportunity list and a fixed-price quote — credited against the project if you proceed.

Commercial — how we sell it
AuditFixed fee · 30 days
Lead time4–6 weeks
Warranty2 years on hardware
Made inIndore, India
EngineeringOn-site commissioning + tuning
PilotOne plant · 90 days monitoring